Glascott has been awarded a package of works on the Gosford Waterfront enhancement project for Hunter and Central Coast Development Corporation (HCCDC), and our crews are now on site. The project is NSW Government’s commitment to revitalise the northern foreshore of Brisbane Water, and it starts from a simple place: what locals said they wanted.
In a 2025 community survey, 3,464 people shared their views, and 72% said walking was their main reason to visit. They asked for better paths to walk and ride, shade, places to sit and eat, green open space and better lighting after dark. That list has become the brief.
Our part covers earthworks, new lighting, custom furniture, concrete and landscaping across two areas. At Waterfront Park, we’re building a new public plaza, with paving that brings in First Nations design elements shaped through Connecting with Country work with Traditional Owners. It will be framed by low retaining walls with built-in bench seating, a shade structure of eight sails, up to 25 fixed tables and benches, and nine picnic settings. Around it, new turf, shrubs and small trees with reinforced grass will soften the space.
Near Brian McGowan Bridge, we’re delivering a shared pathway towards Polytec Stadium, with decorative lighting and carpark improvements. This helps close the gaps in what will become 1.2 km of uninterrupted shared path between Polytec Stadium and the Gosford Sailing Club. Every finish has been chosen to hold up in a saltwater setting.
The wider program is expected to be finished in early 2027. We’ll be sharing updates as the waterfront takes shape, so keep an eye out for progress along Brisbane Water over the coming months.